D I A M O N D L I G H T S O U R C E L I M I T E D 45 M A C H I N E , B U I L D I N G S A N D I N F R A S T R U C T U R E Synchrotron roof solar panels Following the energisation of the first 1 MWp of solar panels on the Synchrotron roof in May 2023, the second phase was energised in July 2024 making a total of 2.7 MWp installed solar panels (Fig. 4). The design annual yield estimation for the installation was 2.3 GWh of electricity, being approximately 5% of Diamond’s annual consumption. Whilst we have not completed a full operating year with the total installation, Figure 5 shows that we remain on target to realise the predicted yield with an actual generation of 1.6 GWh of electricity over the reporting period. Figure 4. 2.7 MWp of solar panels installed on the synchrotron building roof. Figure 5. Electrical power generated by the solar panels on the synchrotron building roof per month (green bars, left axis) and cumulatively (curve, right axis) from April 2024 to March 2025.