 | 10 March 2010 The second crystal through the viewport | | |
 | 10 March 2010 Only a few centimeters to go |  | 10 March 2010 A first look into the monochromator through the viewport |
 | 10 March 2010 The monochromator lid is lowered into OH2 |  | 10 March 2010 The whole team helping to put the lid in position |
 | 19 February 2010 Small detector table 1 in its final position in EH1 |  | 15 March 2010 EH1 after installation of the final components with anti-scatter guard and PSS fencing |
 | 19 February 2010 Large detector table 1 part assembled in EH1 |  | 19 February 2010 View into EH1 through the open roof from the synchotron walk way |
 | 19 February 2010 Preparation for installation of large detector tables onto the base |  | 19 February 2010 Module 4 of the large detector table is lowered into EH1 |
 | 15 February 2010 Survey of large detector table base plate into its final position |  | 17 February 2010 Base plate for large detector table grouted into place |
 | 12 February 2010 Large detector table 1 base plate was lowered into EH1 |  | 12 February 2010 Large detector table 1 base plate was lowered into EH1 |
 | 9 February 2010 Monochromator crystals with cable managment installed |  | 9 February 2010 Monochromator crystal 2 with bracket for cable managment |
 | 14 January 2010 Installation of small detector table base plate in EH1 |  | 9 February 2010 Monochromator crystals with cable managment |
| | 18 December 2009 Cabeling of monochromator finished | .jpg) | 18 December 2009 Cabeling of monochromator finished |
.JPG) | 11 December 2009 Testing of camera modules by PDRA Robert Atwood and support scientist Christina Reinhard | .jpg) | 11 December 2009 Testing of camera modules |
.JPG) | 7 December 2009 Installation of large sample table in Experimental Hutch 2 | | |
.JPG) | 11 December 2009 Installation of large sample table in Experimental Hutch 2 | .JPG) | 11 December 2009 Installation of large sample table in Experimental Hutch 2 |
.JPG) | 7 December 2009 Installation of large sample table in Experimental Hutch 2 | .JPG) | 8 December 2009 Installation of large sample table in Experimental Hutch 2 |
.JPG) | 3 December 2009 Building of the camera modules | .JPG) | 3 December 2009 Building of the camera modules |
.JPG) | 3 December 2009 Building of the camera modules | .JPG) | 3 December 2009 Building of the camera modules |
flat2.jpg) | 3 December 2009 Flat panel detector in the support laboratory | flat.JPG) | 3 December 2009 Flat panel detector in the support laboratory |
.JPG) | 27 November 2009 First user group from Oxford University and principal beamline scientist Michael Drakopoulos (left) | .JPG) | 27 November 2009 First user group and support scientist Christina Reinhard (left) |
1.JPG) | 27 November 2009 Additional lead shielding for EDXD detector | .JPG) | 27 November 2009 Samples for first user experiment |
.JPG) | 20 November 2009 Setup for EDXD first user experiment in Experimental Hutch 1 (with temporary tables) | .JPG) | 20 November 2009 Setup for EDXD first user experiment in Experimental Hutch 1 (with temporary tables) |
.JPG) | 18 November 2009 Setup for EDXD first user experiment in Experimental Hutch 1 (with temporary tables) | .JPG) | 18 November 2009 EDXD rack with shielding in Experimental Hutch 1 |
.JPG) | 18 November 2009 Experimental Hutch 1 entry window installed with alignment laser | .JPG) | 18 November 2009 Experimental Hutch 1 entry window with alignment laser |
.JPG) | 18 November 2009 Lower Huber sample stage installed and commissioned | 1.JPG) | 18 November 2009 Lower Huber sample stage installed and commissioned |
.jpg) | 18 November 2009 Cabins & Services in Optics Hutch 3 finished | .jpg) | 18 November 2009 Cabins & Services in external building finished |
.jpg) | 2 October 2009 White beam stop vessel in Optics Hutch 2 in position | .jpg) | 2 October 2009 Shutter and pump stand in Experimental Hutch 2 |
.jpg) | 2 October 2009 Installation of the Huber sample stage base plate | .jpg) | 2 October 2009 Installation of the Huber sample stage base plate |
.jpg) | 22 September 2009 Testing of the monochromator motion along the beam axis | .jpg) | 22 September 2009 Testing of the monochromator motion along the beam axis |
.jpg) | 18 September 2009 External building | .jpg) | 18 September 2009 External building |
.jpg) | 22 August 2009 Mechanical assembly of monochromator second crystal carriage | .jpg) | 23 August 2009 Delivery of lower Huber stage for Experimental Hutch 1 |
.jpg) | 18 August 2009 Control Room 1 | .jpg) | 22 August 2009 Mechanical work on monochromator ongoing |
.jpg) | 30 July 2009 Factory acceptance test for Huber sample stage | .jpg) | 18 August 2009 Installation of secondary slits in Optics Hutch 2 |
.jpg) | 30 July 2009 Factory acceptance test for Huber sample stage | .jpg) | 30 July 2009 Factory acceptance test for Huber sample stage |
.jpg) | 3 July 2009 Continuous work on the monochromator mechanics | .jpg) | 3 July 2009 Installation of the large detector table base frame in Experimantal Hutch 2 |
.jpg) | 22 May 2009 Installation of copper filters in Optics Hutch 2 | .jpg) | 22 May 2009 Installation of copper filters in Optics Hutch 2 |
 | 12 May 2009 First Light. Pictures of fluorescence from CVD diamond filter in Optics Hutch 1. |  | 12 May 2009 First Light. Pictures of fluorescence from CVD diamond filter in Optics Hutch 1. |
.jpg) | 12 May 2009 Beam on for Optics Hutch 1 | | |
.jpg) | 12 May 2009 I12 team in the Control Room for first light | .jpg) | 12 May 2009 Controls Engineer Ulrik Pedersen setting up for first light |
.jpg) | 7 May 2009 Optics hutch 3 from the inside | .jpg) | 7 May 2009 Walls for Data Analysis Room and Control Room 2 in the external building |
.jpg) | 9 April 2009 External building with lead hutches installed | .jpg) | 7 May 2009 Building works going on in Experimental Hutch 2 |
1.JPG) | 9 April 2009 Optics Hutch 3 lead walls | .jpg) | 9 April 2009 External building with lead hutches installed |
1.jpg) | 26 March 2009 Installation of components in Optics Hutch complete | .jpg) | 09 April 2009 Lead walls for Experimental Hutch 2 finished |
1.jpg) | 17 March 2009 I12 wiggler in its final position in the storage ring | .jpg) | 26 March 2009 Installation of components in Optics Hutch 1 completed (collimator, diamond windows) |
.JPG) | 16 March 2009 Installation of I12 wiggler into the storage ring | .JPG) | 16 March 2009 Installation of I12 wiggler into the storage ring |
.JPG) | 3 March 2009 View upstream through hall for beam pipe in Optics Hutch 3 | .JPG) | 16 March 2009 Installation of I12 wiggler into the storage ring |
.jpg) | 3 March 2009 Construction of lead hutches in external building | .JPG) | 3 March 2009 Construction of lead hutches in external building |
.JPG) | 9 February 2009 Beam for monochromator | .JPG) | 9 February 2009 Beam for monochromator |
.JPG) | 12 January 2009 Connectors of 23 element horseshoe detector | .jpg) | 9 February 2009 Assembly of monochromator crystal cage |
.JPG) | 12 January 2009 Crystals of 23 element horseshoe detector | .JPG) | 12 January 2009 23 element horseshoe detector in detector lab during first setup |
.jpg) | 8 January 2009 Craneworks in external building | .jpg) | 8 January 2009 Craneworks in external building |
.JPG) | 8 January 2009 External building | .jpg) | 8 January 2009 Floor layout of Experimental Hutch 2 in external building |
| 2 December 2008 Monochromator chamber with Design Engineer Adrian Birt (left) and Senior Mechanical Engineer Tim Hill (right). | | 2 December 2008 Monochromator chamber. |
 | 7 November 2008 General view of External Building site |  | 7 November 2008 External building roofing in progress |
 | 7 November 2008 External building roofing in progress |  | 28 October 2008 Steelwork being completed |
 | 28 October 2008 Crane back on site to install the remaining steelwork |  | 28 October 2008 Experimental Hutch 2 roof complete |
 | 22 October 2008 Control Cabin 1 |  | 22 October 2008 Experimental Hutch 1 |
 | 22 October 2008 Optics Hutch 1 |  | 17 October 2008 Forest of scaffolding for the roof shuttering work |
 | 17 October 2008 Experimental Hutch 2 roof cast |  | 17 October 2008 External Building site |
 | 29 September 2008 Side view of building and Experimental Hutch 2 |  | 29 September 2008 Experimental Hutch 2 walls complete |
 | 29 September 2008 General view of External Building site |  | 9 September 2008 Internal beamline, installation of wall and roof panels of control room and instrumentation areas. |
 | 9 September 2008 Internal beamline, installation of wall and roof panels of control room and instrumentation areas. |  | 9 September 2008 The size of the EH2 bunker is apparent in this view. |
 | 9 September 2008 External building general site view. Bunker wall reinforcement still growing. |  | 22 August 2008 External Building view from west side. |
 | 22 August 2008 External Building bunker reinforcement and shuttering. |  | 22 August 2008 External Building general site view. |
 | 22 August 2008 Alignment of front end begins. |  | 22 August 2008 View through the opening in the storage ring roof, with the I12 front end installed. |
 | 19 August 2008 Port shutter and absorber next to I12's port in the storage ring wall. |  | 19 August 2008 Storage ring roof off and first parts of front end in. |
 | 15 August 2008 Steel framework of control & instrumentation areas either side of OH1-OH2 beamtube |  | 15 August 2008 Inside EH1. |
 | 15 August 2008 Removing the storage ring tunnel roof. |  | 12 August 2008 External Building bunker wall and floor slab reinforcement. |
 | 15 August 2008 External Building bunker wall reinforcement started. |  | 6 August 2008 I12 Front End assembled on the main experimental hall floor for vacuum baking and testing. |
 | 6 August 2008 I12 Front End assembled on the main experimental hall floor for vacuum baking and testing. |  | 6 August 2008 First section of transport pipe between the internal and external parts of the beamline. |
 | 6 August 2008 First section of transport pipe between the internal and external parts of the beamline. |  | 6 August 2008 External Building concrete work below ground level nearing completion. |
 | 2 July 2008 Concrete pumping for sample stage pit floor. |  | 2 July 2008 Concrete pumping for sample stage pit floor. |
 | 26 June 2008 Sample stage pit zone being prepared for first concrete pour. |  | 26 June 2008 "Inside" the External Building. |
 | 19 June 2008 Additional piling and excavation of pit zone for sample stages. |  | 13 June 2008 I12 External Building site. Steel frame continues to grow. |
 | 13 June 2008 I12 External Building. End view. More steelwork waiting to be added. |  | 6 June 2008 Steel building frame takes shape. |
 | 6 June 2008 Steelwork continues. |  | 6 June 2008 I12 External Building site. |
 | 4 June 2008 First steelwork for External Building being erected - view from lab 69. |  | 4 June 2008 The first steelwork for the External Building is erected. |
 | 23 May 2008 View of I12 External Building Site. Piling completed and building shell foundations poured. |  | 23 May 2008 Part of External Building shell foundations. |
 | 7 May 2008 Piling in progress. |  | 7 May 2008 Piling Machine on I12 external building site. The depth of the piles is about 3/4 of the length of the drill string. |
 | 8 April 2008 View of I12 External Building construction site. |  | 8 April 2008 Drainage diversion and ground preparation for I12 External Building. |
 | 25 March 2008 Removing cladding from main building |  | 5 March 2008 I12 groundbreaking ceremony for JEEP beamline |
 | February 2008 Internal Transfer Tube Installation |  | February 2008 I12 Internal Transfer Tube Work in Progress |
 | 7 December 2007 Interior of Experimental Hutch 1. |  | 7 December 2007 I12 Hutch Construction. Internal hutches painted |
 | 28 November 2007 I12 Hutch construction. OH1 and Side Station hutches being painted. |  | 22 November 2007 I12 Hutch Construction. Roof panel of EH1 being installed |
 | 9 November 2007 End view of Experimental Hutch 1 from the walkway. |  | 9 November 2007 View through the beam tube hole at the end of Experimental Hutch 1. The transfer pipe to the External Building will start here. |
 | 9 November 2007 View from the Storage Ring roof. Optics Hutch 1 is in the foreground. |  | 7 November 2007 Working on the tricky corner where Experimental Hutch 1 meets the walkway. |
 | 5 November 2007 Downstream wall of Experimental Hutch 1 being installed. |  | 5 November 2007 "South" side of beamline, with Optics Hutch 2 walls compete and Expermental Hutch 1 in progress. |
 | 31 October 2007 Using one of Diamond's 20 tonne cranes to lift a wall panel for Experimental Hutch 1. |  | 31 October 2007 Experimental Hutch 1 in progress. |
 | 26 October 2007 Installing upstream wall of Experimental Hutch 1. |  | 26 October 2007 First panels for Experimental Hutch 1 being installed. |
 | 23 October 2007 Downstream wall of Optics Hutch 2 complete. |  | 17 October 2007 Optics Hutch 2, awaiting end wall installation. |
 | 14 October 2007 Optics Hutch 2 in progress. |  | 9 October 2007 Upstream wall of Optics Hutch 2 in place. |
 | 5 October 2007 Optics Hutch 1 and Side Station construction continues. |  | 5 October 2007 The first panels of Optics Hutch 1 are being installed by the rachet wall. |