Beamlines | I12 - Beamline Layout

I12 Beamline

The I12 beamline is divided into two parts, with an internal building and an external building.

Beamline layout

 

Internal Building

The internal building hosts the following hutches:

  • Optics hutch 1 (OH1)
  • Side station 1 (SS1)
  • Optics hutch 2 (OH2)
  • Experimental hutch 1 (OH1)
  • Control cabin 1 (CC1) for control of the internal beamline
  • User room (UR) to provide additional space for users and beamline staff using CC1

 

Fig: Control cabin 1 in the internal building (during installation)

 

 Fig: User room provides additional space for users and beamline staff when working in CC1

External Building

The external building comprises of:

  • Optics hutch 3 (OH3)
  • Experimental hutch 2 (EH2)
  • Control cabin 2 (CC2) for control of the external beamline
  • Data aquisition room
  • Strong room for storage of valuable items

 

Fig: Control cabin 2 in the external building

These pictures show an artist’s impression of the I12 External Building. The building has a loading bay area with access from the synchrotron building peripheral road. This permits delivery of large samples and experimental equipment directly to the second experimental hutch inside the building. Construction work started in January 2008 and is now well underway.

See the latest Construction photos.

artists impression of external building