Beamlines | Construction photos

Hutch photos

CIA December 2007

The outside of the I11 CIA (Control and Instrumentation Area).

Control Cabin

December 2007

Inside the I11 User Control Room.

Optics Hutch

August 2006

The outside of the I11 optics hutch.

Experimental hutch

August 2006

Outside the I11 experimental hutch.

August 2006

Construction of the I11 optics hutch and experimental hutch is completed.

space for I11

July 2006

The space reserved for I11 in the experimental hall of the synchrotron building.

 

Equipment photos

First beam for I11

November 2007

First beam is seen in the I11 Optics hutch.

December 2007

The diffractometer in the I11 experimental hutch.

 undulator  

December 2007

The I11 prior to installation in the storage ring.

 Robotic arm  

December 2007

The I11 robotic arm prior to installation in the experimental hutch.

 double crystal monochromator

December 2007

The Double Crystal Monochromator (DCM) in the I11 optics hutch.

 Optics hutch  

December 2007

Inside the I11 optics hutch.

 diffractometer

August 2006

Prototype multi-analysing crystal (MAC) device with Si111 crystals tested on Station 2.3, SRS. Each crystal is offset by +/- n2o.

 CAD drawing

August 2006

Design of powder diffractometer to be supplied by Newport. The multiple arms (a/2a) on 2q-circle are for the mounting of MAC devices.

 ETL detector

August 2006

High performance ETL detectors (x3) designed to have low noise (0.25 cps) and to handle high count rate (5 MHz cps)