For details of beamline specifications, lab equipment and facilities available, please choose an area of the beamline, by either clicking on the plan or choosing one of the surrounding links.
Control room | Experimental hutch 2 | Experimental hutch 1 | Optics hutch

Chemistry lab | UHV lab | Clean room
Design specifications
| Energy range | 6–30 keV |
| Energy resolution (Δ E/E) | <1 x 10 -4 |
| Energy stability | 0.5 eV |
| Flux @ 10 keV at sample | <1 x 1014 s-1 |
| Beam size at sample | 50 µm x 100 µm (v x h with mirror) |
| Beam divergence @ 10keV at sample | 25 µrad (vertical) x 100 µrad (horizontal) |
The design specifications refer to the cryo-cooled undulator that will be installed in June 2010. Before this date, a U23 undulator will be in place, capable of energies up to 20 keV.
